BOOM SECTION
For the Chrome series, the section of the boom is formed by an integral metal plate in the outer area and a C profile in the inner area, an ideal solution in terms of great strength and overall lightness.
Front loader with manual implement levelling Fitting brackets supporting loader from tractor front end to rear axle shafts. Hydraulic system conforming to tractor specifications.
Standard equipment
- Two double acting cylinders for lifting
- Two double acting cylinders for the operation of the implement
- Quick-release of loader from tractor VELOTAK
- Implement quick release EURO
- Hydraulic quick-fit couplings Adjustable support legs
Technical Specifications
Max lifting height | F10 = (pivot point) = 3200mm (tilted bucket) = 2260mm |
---|---|
For more technical data | Refer to technical data sheet under documents tab |